Cloverdale, Cloverdale749, multi-family, multifamily, steel, metal wall, perforated wall, modern design, modern architecture, metal architecture,

Metal Wall Panels Clad Luxury Condo Building

Wednesday, January 28, 2015

LOUISVILLE, KY…Metal Sales Manufacturing Corporation provides its T2630 perforated and solid metal wall panels for Cloverdale749, a 10,500-square-foot residential structure located in Los Angeles, CA.

The modern six-unit building is located just around the block from the historic Miracle Mile hub, near the Los Angeles County Museum of Art and the A+D Architecture and Design Museum.

Read More, Download Word Doc, and Download Photos

Bronze Level Sponsor Exhibiting at Booth #720

Tuesday, January 27, 2015

DELRAN, NJ—FreeAxez® will kick off 2015 by attending the BICSI Winter Conference & Exhibition on February 22-26 in Orlando as a Bronze Level Sponsor. They will display and demonstrate their quick-connect, whole-building cabling distribution system, inclusive of various models, at the show.

In 2014, FreeAxez won a Best of Show award at InfoComm 2014 and the FreeAxez Power system won a Best of NeoCon Gold Award in the Workplace Technologies category.

Read More, Download Word Doc, and Download Photos

Logo for Zurn Industries, LLC

Integration with MasterSpec Coming Soon

Monday, January 26, 2015

ERIE, PA – Zurn Industries, LLC announces an expansion of its ZurnSpecSM platform with the addition of GreenWizard – a building product management solution connecting the AEC community with manufacturers to identify, evaluate, track, and manage their products.
 

Read More, Download Word Doc, and Download Photos

Gray tile in a running bond pattern is accented by TEC® Power Grout in Charcoal Gray.

One-of-a-Kind iCar Building Features Imported Tile

Monday, January 26, 2015

AURORA, IL…One of the most awarded BMW dealerships in the United States, located in Southern California, recently underwent a makeover. Flooring and wall renovations at the 90,000-square-foot facility, undertaken with TEC® products, had to live up to the dealership’s superior reputation aesthetically and provide the performance required for the demanding showroom environment.

Read More, Download Word Doc, and Download Photos

Third-party verified testing conducted by Professional Service Industries, Inc. (PSI) reveals the Zurn High Efficiency Toilet and Carrier System evacuates waste more than twice as far as industry-standard 1.28 gpf systems.

1.1 gpf efficiency with line carry 2x industry average

Thursday, January 22, 2015

ERIE, PA – Zurn Industries, LLC introduces the impact of two high performance restroom products - engineered together to deliver a combined water-savings and line carry performance unmatched in the commercial plumbing industry. The new solution is the Zurn High Efficiency Toilet and Carrier System.

This new system pairs together the Zurn EZCarry™ High Performance Carrier System (launched earlier this month) and the Zurn EcoVantage® 1.1 gpf ZTR Sensor Wall Bowl System (launched in October 2014).

Read More, Download Word Doc, and Download Photos

Zurn Associates who helped make food drive a success

Monday, January 19, 2015

ERIE, PA – Employees of Zurn Industries, LLC more than doubled the amount collected for a food drive compared to 2013’s total, benefiting the people served by local food banks across the country.

As a whole, Zurn raised a total of 17,980.3 pounds of food or 23.66 pounds per associate across the US,  and in Canada.  This is the fourth consecutive year that Zurn conducted the pre-Thanksgiving Holiday food drive.

Read More, Download Word Doc, and Download Photos

R.F. Knox Company, Inc., a fabricator based in Smyrna, G.A., executed Civitas’ vision by surrounding the woven wire mesh with U-edge frames.

Wire Mesh Structure Artfully Provides Shade in Greenville’s One City Plaza

Wednesday, January 14, 2015

MUKWONAGO, WI…Aggressive revitalization and community development projects have transformed Greenville, S.C. into one of America’s best downtowns, according to Forbes Magazine. A shade structure in its new ONE City Plaza, composed of Banker Wire mesh, embodies the city’s identity and encourages passers-by to enjoy the public space.

Read More, Download Word Doc, and Download Photos

The new Zurn Aqua-FIT Faucet System

Sleek, Durable, and Modular: Easy for Retrofit Jobs Now or Later

Wednesday, January 14, 2015

ERIE, PA – Zurn Industries, LLC introduces a sophisticated modular sensor faucet line, the Z6950 Aqua-FIT Faucet System. The system provides multiple performance benefits, numerous modern design aesthetics, the ability to retrofit just a new spout onto an existing electronics base, and concealed sensor lens and aerators to prevent damage from vandalism or cleaning chemicals.

Read More, Download Word Doc, and Download Photos

The Zurn EZCarry™ High Performance Carrier System

Wednesday, January 14, 2015

ERIE, PA – Zurn Industries, LLC, the leader in engineered water solutions, introduces the Zurn EZCarry™ High Performance Carrier System providing up to three times better waste line carry, a 500 lb. standard load rating, and unmatched labor saving features.

Read More, Download Word Doc, and Download Photos

Zurn NR3XL Water Pressure Reducing Valve with Zurn Wilkins Z-Bite™ Solderless Connections

Fast Installation and Watertight Seals

Monday, December 29, 2014

ERIE, PA – Zurn Industries, LLC announces the launch of the Zurn Wilkins Z-Bite™ and Z-Press™ Solderless Connections–creating a wide array of push-fit and press-fit connection options to many of the company’s products.

The new Zurn Wilkins Z-Bite and Z-Press Solderless Connections will connect to backflow preventers, regulators, and thermostatic mixing valves (TMVs). In addition, Zurn also will offer standalone push-fit and press-fit tailpiece kits compatible with Zurn union threads.

Read More, Download Word Doc, and Download Photos

Thursday, December 18, 2014

ERIE, PA – Zurn Industries, LLC provided numerous products for the large-scale, expedited reconstruction of one of college football’s iconic stadiums, the Citrus Bowl in Orlando, FL.

Everything below the stadium’s upper deck was demolished and reconstructed as part of an overall modernization project for a venue that dates back to 1936. The $200 million project began in January 2014 and was finished in only ten months, providing Orlando with an 85 percent new stadium.

Read More, Download Word Doc, and Download Photos

Staffing Changes Follow Pro Spec® Acquisition

Monday, December 15, 2014

AURORA, IL… H.B. Fuller Construction Products made two key changes to its organizational structure by creating and filling two new positions: Business Director for the Wholesale Flooring Distribution business and Business Director for Concrete Repair and Restoration. These changes will help the company continue to offer the services and quality its customers expect.

Read More, Download Word Doc, and Download Photos

Pages